Luling Joint Replacement Project

  • By cecinc cecinc
  • fixed bridge rehabilitation
  • 0 Comment

Contracted by LADOTD, C.E.C., Inc. was tasked with the replacement of joints without compromising continual flow of traffic or the structure’s support.

The project included:

  • Remove existing joints
  • Break out concrete around the existing joints
  • Cut rebar as necessary and remove the joint from the recess
  • Prepare the area to take the new MBJS
  • Install and set the new joint to the correct opening
  • Secure in place in accordance with the Plans

The existing joint was removed in sections, while managing to install the new MBJS’s (modular bridge joint system).

Contact Us

922 W. Pont des Mouton Road
Lafayette, La 70507
(337) 237-1984


  • Bridges
    • Bridge Repairs
    • New Bridge Construction
  • Industrial
    • Industrial Flatwork & Foundations
    • Industrial Structural Steel
  • Marine
    • Dolphins
    • Marine Fenders
    • Wharf & Dock Construction
  • Structural
    • Building Construction
    • Foundations & Framing Repairs
    • Structural Steel
    • Trusses

Featured Projects

  • I-20 Mississippi River Bridge at Vicksburg

  • Causeway Boulevard at I-10 Interchange

  • I-10 Mississippi River Bridge Project

Footer Elements

Visit Us

Contact Us

922 W. Pont des Mouton Road
Lafayette, La 70507
(337) 237-1984

Featured Projects

  • I-20 Mississippi River Bridge at Vicksburg

  • Causeway Boulevard at I-10 Interchange

  • I-10 Mississippi River Bridge Project

Get in Touch


CEC,INC - Copyright © 2014.

  • Marine
  • Structural
  • Industrial
  • Bridges
  • Safety
  • Contact
  • Careers